Metal Buildings for Coatesville, Indiana Build and Buy Online! ICON Building SystemsRecommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Components/AccessoriesWhich base trim option should I choose? - The base trim that you choose for your steel building will depend on your building's needs and the type of foundation you use. Although we strongly recommend a notched base, we do offer several additional base trim options to suit your specific needs. Please see base conditions for more helpful information and illustrations. What type of windows do you offer? - We offer a selection of windows for your building. To learn more about what's available please visit the accessories section of our website. What comes with the doors and windows? - All of our doors and windows come with the required hardware to install them into your steel building. We provide the framing, trim, and flashing for a proper installation. How do I know where to place my windows and doors? - Windows and walk doors are generally "field located." You, as the customer, will pick the location, cut the corresponding panel to size and proceed to mount the doors and windows. If you choose to include a large number of windows or doors we may ask you to give us your proposed location to ensure proper building bracing. How do I attach my doors and windows? - All of our walk doors are self-framing, so they include the necessary items to mount them on your building. Our windows are secured by screwing the window trim directly into the building. This is also known as self-flashing. If you live in a high wind area, please talk to one of our design consultants about additional door and window mounting options. What is the R-Value of your insulation? - The r-value of our insulation depends on the thickness you choose. It will vary between R-10 and R-19. Please see the r-value section of our website for more helpful information. Walk DoorsWalk doors can be provided as pre-assembled or knock down (field assembled). Metal Building Depot provides solid doors for both options in the following sizes: 3070, 4070, and 6070. The walk doors are typically keyed alike per project. Because of unknown variables, Metal Building Depot does not offer fire rated doors or doors to fit in masonry. Features of the pre-assembled doors are as follows: Foam insulated specifically designed for metal building use. Pre-assembled and self-framing for ease of installation. No framed opening required if Metal Building Depot standard girt spacing is utilized. Doors are finished in a two-coat primer; color selection is white or bronze. Doors are shipped in wood crates for protection. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Insulated jambs. 3070 and 6070 doors are made of 20-gage material, 18 gage is available. Features of the knock down doors are as follows: Foam insulated specifically designed for metal building use. The walk door is shipped knocked down for field assembly. Doors are textured 20 gage galvanized prime painted and pre-finished in either white or bronze. Weather stripping and standard entrance lock is included. The walk door package is shipped with polybag and full cardboard carton. All doors have Grade 2 lever locks as standard. Hinges are ball bearing and powder coated. Recommended Installation Methods of InsulationRoof insulation rolls are cut to lengths that will cover the distance from eave to eave, leaving a one-foot overhang on each side of the building. 1) Start at the end of the building and temporarily secure one end of the roll by attaching the insulation to the eave strut with double-faced tape. 2) Pull the insulation across the purlins with the vapor barrier toward the building interior. Double-faced tape attached to the opposite end of the insulation will keep tension on the roof roll while the metal panels are being attached over the insulation. 3) Install the next roll in the same manner, making sure the rolls are stretched tight, aligned properly and closely butted. 4) Fasten tabs using one of the methods described on the following page. Any rips or tears must be covered with matching facing tape to ensure a tight vapor seal. 5) Trim excess insulation flush to prevent it from acting as a wick and moving water into the building. Insulating Against Radiant Heat Traditional forms of mass insulation, like fiberglass, are effective in preventing heat transfer by conduction and convection, but they less effect on radiant heat. Between 80 and 90% of the radiant heat striking fiberglass will pass through or be "emitted". Radiant transfer typically has as much impact on the temperature in a building as conduction and convection. For more information on radiant barrier facings click here. Thanks for visiting Metal Buildings for Coatesville, Indiana. The place to shop online for metal building or steel buildings. |