Metal Buildings for New Baltimore, Michigan Build and Buy Online! ICON Building SystemsHeat TransferEffectively controlling temperature in a steel building requires insulation to be present along exterior walls and roof. When a temperature differential is present in an enclosed steel building, heat will work from warmer areas to colder areas until the temperature in the building has stabilized. At the point of thermal stabilization, the cooler (and heavier) air will be present at lower elevations and warmer air will be present at the roofline. The function of insulation is to help stabilize air temperature at more desirable levels. When it is hot outside, preventing heat from transferring into the building is the goal, and of course in the winter we want heat to remain inside. Heat transfer occurs in three ways: Conduction : Occurs in a solid or liquid when heat from one object is transferred by touch to another object. An example of this occurs when a pot on a stove will heat up by conductive heat transfer from an electric coil. Convection : Occurs with the physical movement of air. There are two types of convectional heat movement. The first is natural, where hot air rises displacing the cold air and moving it down. The second type is forced or mechanical convection. This occurs when an object, like a fan, physically moves or "forces" the air to move. Radiation : Occurs when an object is warmer or hotter than the air around it. For example, the sun, which is hotter than everything around it, radiates heat waves that travel through the air and is either absorbed by or reflected by the surface it comes in contact with. COMMERCIAL OFFICESYour place of business should and can be more than just a place to work. It should reflect your company's image and be no less comfortable, functional or attractive than your living environment. Entry-ways and lighting, interior wall placement, and location of restrooms are as important in your office building as they are in your own home. Properly planned, your facility will serve your needs for many years to come, and you will avoid future changes or costly remodeling. Modern ceiling and interior wall systems are very easily adapted to our manufactured building components using standard methods. For instance, perimeter sheet rock walls may be installed by simply attaching metal furring strips (hat channel) to the secondary wall framing members (girts). Similarly, acoustic panel or dry-wall ceilings may be installed by simply wrapping the ceiling suspension wires around the secondary roof framing members (purlins). Additionally, port-a-wall systems may be installed as needed throughout the structure. Additional loads from heating and air conditioning systems, dropped ceilings, electrical conduit and lighting fixtures, or large mechanical sprinkler systems can be accommodated easily at your request with minimal cost, assuring a full roof-load certification. The building components may represent a small percentage of the total cost of your office budget. Therefore, we are careful to ensure that the main structural components we provide will be reliable, helping to protect your investment against any water seepage, leaks or storm damage that can deteriorate your office complex. When selecting the manufacturer of your building components, careful consideration must be given to both function and price. Your dealer will encourage you to have an architect review all aspects of your building plan, including lighting requirements, window heights, storage space, carpet wear ability, entrances, landscaping, parking and signage, to ensure you of a facility that will maintain its value and be a source of pride for years to come. Proper Ventilation of a BuildingProper ventilation in a building can be an effective measure for condensation control. The end use of the building must be the controlling ventilation design parameter, especially above drop ceiling areas. Ventilation system design should be done at the initial building design stage. Use of a design professional is strongly recommended to assure the best possible system. CONDENSATION CAN BE MINIMIZED THROUGH CONSIDERATION OF CLIMATE, RELATIVE HUMIDITY AND THICKNESS OF INSULATION. FacingsIn addition to acting as a decorative protection barrier, facings serve an integral part of the overall insulation system. Facings provide vapor barriers, light reflectivity and structural strength. In some cases, a reinforcement of fiberglass scrim is used for extra rigidity and greater impact resistance. The effectiveness of a vapor barrier depends on three primary factors: 1) Location within the insulated section 2) Permeance 3) Proper installation ErectorsDo I need a professional erector to put up my metal building? - A majority of our clients choose to erect the metal buildings themselves. Your package includes detailed erection drawings and an erection manual with every metal building shipped. We design every metal building to be erected easily. If you do not feel comfortable erecting your own metal building, a local contractor can do the job for you at a relatively low cost. What if I have questions during the erection of my metal building? - We're here to help. We have professional metal building erectors on-staff and they will always be available for your questions. Do you recommend erectors? - No. Recommending metal building erectors is difficult because we cannot guarantee the quality of their work as we do our own. Check around and you should be able to find a qualified metal building erector in your local area. How long does it take to erect a metal building? - The time it takes to erect your metal building will depend on the size of the metal building, the size of your crew, and the skill of the workers in your crew. It can take as little as a few days. Thanks for visiting Metal Buildings for New Baltimore, Michigan. The place to shop online for metal building or steel buildings. |